CNC machine tool mechanical parts installation and debugging considerations - Solutions - Huaqiang Electronic Network

Single chip microcomputer STM32L151CCU6
Mobile phone crystal 3.2*2.5mm 3225 26M (26.000MHZ)
SMD aluminum electrolytic capacitor
Adjustable capacitor Murata genuine original
Probe current voltage pin 420*4450 head diameter 5.0 over current current and voltage pin

The quality of CNC machine tool installation and commissioning directly affects the average trouble-free working time of CNC machine tools. The better quality of installation and commissioning can reduce downtime and maintenance costs during the use of CNC machine tools.

1. Precautions for installation and commissioning of spindle bearings

(1) Installation and commissioning of a single bearing

When assembling, make the eccentricity of the spindle positioning inner hole and the spindle shaft diameter as close as possible and the eccentric amount of the bearing inner ring and the raceway as close as possible, so that the eccentric amount after assembly can be reduced.

(2) Installation and commissioning of two bearings

When the two bearing spindle bearings are installed, the eccentricity of the front and rear support bearings should be the same, and the eccentricity should be appropriately selected. The accuracy of the front bearing should be one level higher than the accuracy of the rear bearing to minimize the amount of eccentricity of the front end positioning surface of the assembled spindle component. When the maintenance machine tool disassembles the spindle bearing, since the original manufacturer has adjusted the eccentric position of the bearing, it is necessary to make the circumferential position mark before disassembly, to ensure that the original relative position of the bearing and the spindle are unchanged after reassembly, and reduce the spindle component. influences.

When the bearing with interference fit is assembled, it needs to be installed by hot charging or cold charging. Do not slam the smashing force to avoid damage to the bearing during installation and affect the performance of the machine.

2. Precautions for installation and commissioning of ball screw nut pair

The ball screw nut pair is only used to withstand axial loads. Radial forces and bending moments can cause undesirable load on the ball screw pair to cause additional surface contact stress, which may cause permanent damage to the lead screw. Therefore, when installing the ball screw nut pair to the machine, you should pay attention to:

(1) The ball nut should move within the effective stroke. The limit must be set at both ends of the stroke to prevent the nut from falling off the screw shaft and causing the ball to fall off.

(2) Due to the high efficiency of the ball screw nut transmission, it cannot be self-locking. When it is used for vertical direction transmission, if the weight of the component is not balanced, it is necessary to prevent the reverse transmission caused by the component's own weight after the transmission is stopped or the motor is de-energized. , to prevent reverse transmission methods available: worm gear drive, electric brakes, etc.

(3) The axis of the screw must be parallel to the axis of the matching guide rail. The center of the bearing seat at both ends of the machine and the center of the nut seat must be lined up at three points.

(4) When the ball screw nut pair is attached to the machine, do not remove the nut from the screw shaft. If it is necessary to remove it, use the auxiliary sleeve, otherwise the balls may fall off during loading and unloading.

(5) When the nut is installed in the nut seat mounting hole, avoid impact and eccentricity.

(6) In order to prevent the ingress of chips, the ball screw nut pair may be worn, and a protective device such as a wrinkle protection cover, a spiral steel belt protection sleeve, etc. may be added to completely protect the screw shaft. In addition, dust can be added to both ends of the screw nut when there is a lot of floating dust.

3, linear rolling guide installation and debugging matters needing attention

(1) Handle gently during installation to avoid the impact of the straight line on the guide rail.

(2) It is not allowed to detach the slider from the guide rail or push it back beyond the stroke. If it is difficult to install, you need to use the guide rail when you need to remove the slider.

(3) When the linear rolling guides are used in pairs, the main and auxiliary rail pairs are first installed. First, the main rail pair is installed. The reference side of the guide rail is closely attached to the reference side of the mounting step, and the mounting bolts are tightened, and then the main rail pair is attached. For the reference, find the auxiliary rail pair. Finding refers to the parallelism and flatness of the two guide rail pairs. Finally, tighten the fastening bolts of the slider in turn.