Integrated Yuba wire installation method


Here are the steps to integrate the Yuba installation:

1. Installation of corner lines

The installation strip should be installed flat and firm, determine the installation height, and draw a horizontal line. After the tiles are properly placed, in the horizontal situation, the matching corner lines of the ceiling are integrated and tightly fixed on the tiles, so that there is no obvious gap.

2. Installation of the keel

The lower boom and the light steel keel are placed, and the distance between the boom and the keel is the same as the panel size. Open the expansion eye at the top and fix all the booms. Connect the lower bottom of the boom to the hook. Then fix the main dragon skeleton in the middle of the hook and adjust the height nut so that the plane of the main keel is 3cm away from the plane line on the edge strip. And fastened.

3. Pay for the installation of the keel

According to the actual installation length minus 5mm, take the required keel, put on the triangular hanging piece, and temporarily suspend all the keel with the triangular hanging piece on the main keel according to the drawings.

4. The installation of the gusset

Wear clean gloves and install the gussets to take into account the overall aesthetics and bilateral symmetry. Cutting method: Fix the template, use the utility knife and ruler to describe it more than three times, cut the edge with a scissors to cut it into a 90 degree angle, and fold it by hand 2-3 times. The corresponding surface of the template cutting opening is stuck in the keel, the cutting surface is placed on the edge strip, and the edge strip is pulled out to clamp the template. At this time, the triangular lifting piece can be clamped with the steel tongs and the main keel. . When the middle part template is installed, the two corresponding faces of the template are respectively stuck in the keel, and the gap between the templates is controlled to maintain the straight line of the seam. Note: After completing the installation of each row of templates, the triangular lifting pieces should be clamped with the steel tongs and the main keel.

5. Host installation

When designing the installation position of the heating type host according to the drawing, replace the template with the main panel to confirm the accurate installation position of the main unit; then place the main unit on the top of the keel. Install (embed) the electrical appliance, and make the panel and electrical interface flat and seamless.