The construction safety steps are as follows:
1.1 Ascending the pace of temporary personnel and goods dual-use elevators, Eternal (temporary) escalators, chimneys, demolition, construction workers, normal climb; deal with the steel column to the top of the column to remove the slings and other chimney demolition construction. It is often adopted before the resettlement to accept the strong binding on the ground. The east-west ladder is temporarily fixed on the side of the steel column. The essentials of dismantling after use.
1.2 The flat channel method often accepts the situation of the east-west scaffolding channel, the steel pipe scaffolding channel, the device channel plate, the handrail rope and the like. The handrail rope is in an environment without a quiet passage. The welded joints of the steel columns received at a certain height from the steel beam are passed through the steel wire rope or the nylon rope to form the handrail rope. The chimney demolition construction personnel can be used for the quiet belt and the support rope when walking on the steel beam. Make sure you are quiet.
1. The connection between the steel columns of the 3-column operating platform must accept the essentials of welding and fastening. The operating platform must be provided for the welder to use. It is common to accept an east-west platform or use a steel pipe to build a platform. Secure the column before lifting. Lift with the column.
1.4 The beam and column between the beam and the beam and the joint between the beam and the beam usually accept the high-strength bolt or welded joint condition. These nodes operate in the same way as steel hanging baskets. It can be hung on steel beams. Use maneuvering. Easy to move.
1.5 Whole network, broken high-rise steel layout placement Chimney demolition construction often set up floor horizontal net, vertical protective net and pick net. Floor level net can be arranged on the steel beam surface. It can also be placed on the hook of the lower flange of the steel beam and can be placed under the scaffolding channel. The vertical net and the picking net serve lateral protection.
4. The chimney demolition construction stage is placed in the steel layout. Three-dimensional staggered work on the site. Some objects probably resolved the mesh of the quiet net and leaked the chimney to dismantle the construction workers. Therefore, it is necessary to set a break layer. 2. The metal profiled steel plate in the floor panel is often used as the breaking layer in the demolition of the chimney. Usually in the steel layout placement chimney demolition construction, the laying of the metal profiled board is inserted into the chimney to dismantle the construction to play a quiet and severe role.