Low-voltage line and low-voltage equipment leakage fault finding method - Database & Sql Blog Articles

1.5PF SOT23-6 Low Capacitance 5V Breakdown Voltage 6V SRV05
Probe current voltage pin 420*4450 head diameter 5.0 over current current and voltage pin
Brand AVX TPSE226M035R0125 Low impedance tantalum capacitor AVX 22
Shunuo varistor / ESD varistor / product complete / Sunlord first-class agent

1. Preparation tools: multimeter, soft copper wire, a full length of about 12M, boarding tools, foot buckles, belts, screwdrivers, a total length of 30CM. 2. First, in the power distribution room, the road that can not send electricity is leaking The segment is opened, firstly, it is possible to eliminate the possibility of power leakage. 3. When the leakage is leakage on the side of the leakage load, remove the zero line on the side of the leakage load, and connect the black meter on the load side zero line with the red meter of the multimeter. Connect a soft ground wire and a screwdriver to make a temporary grounding wire, but the grounding point must be wet. If the measured value is below 2000 ohms to several hundred ohms, it is not directly grounded. If the measured value is 0 ohms, it is directly grounded ( The measured value is the value of the four lines because it is connected in series through each electric appliance. 4. Find the first branch along the line or disconnect it, and measure the value according to the above method (the four bow lines of the overhead line must be all) Demolition) If the measured value is on the first branch line, look for the branch line. The one-to-one demolition line includes the powerhouse to remove the value above 2000 ohms, which means that the line has been leaking. Finding the leakage point is very convenient, but the staff is at 4 5 people will be fast. 5. Note: The grounding line can not be hung on the leakage load side. Someone should be in the power distribution room. The person on the pole must be supervised. After finding the fault point, the branch line and the broken bow line will be connected. Connected and the zero line of the leakage port is connected, you can test the power.

Direct Drive Servo Motor

Kassel direct drive Servo Motor application fields:

1. Machinery industry (machining center, CNC punch, bending machine, shearing machine, PLC program controller, various types of automobile testing equipment, assembly equipment, welding equipment, etc.)

2. Printing industry (printing machine, printing machine, offset printing machine, rotary machine, laser phototypesetting, proofing equipment, automatic punching machine, inkjet printer, folding machine, paper cutter, sewing machine, glue binding machine, computer three Side sealing bag machine, etc.)

3. Medical industry (monitor, B ultrasound machine, CT control box, ECG tester, X-ray machine, slicer, hemodialysis machine, temperature controller, etc.)

4. Food industry (sterilizer, homogenizer, labeling machine, can making machine, flow controller sealing machine, packaging machine, coffee machine, etc.)

5. Rubber tire industry (steel belt production line, inner liner extrusion line, steel wire calender, double compound extruder, heavy internal mixer, etc.)

6. Elevator industry (door control and floor control of various elevators)

7. Robot industry (application of robot joints, servo multi-axis application)

For more industry application options, please leave a message to contact us.

Direct Drive Servo Motor,Servo Motor Direct Drive,Direct Servo Control,Direct Drive Linear Servo Motor

Kassel Machinery (zhejiang) Co., Ltd. , https://www.kasselservo.com

Posted on